Two homes at the same price can be very different purchases. Warranties, standard features and contract terms all vary. This guide explains what to check and gives you a checklist to use with every builder.
It is general information, not legal advice. For your own contract, talk to a Texas real estate attorney.
Start with the written warranty
New-home warranties usually come in tiers. The FTC says coverage for workmanship and materials on most components "usually expires after the first year," coverage for HVAC, plumbing and electrical systems "is generally two years," and some builders cover "major structural defects" for up to 10 years.[5] Treat that as a starting point for questions, not a promise. The only terms that count are the ones in the builder's written warranty.
Builders may back their warranty themselves or, as the FTC notes, buy warranties from third-party independent companies. The FTC also says builder warranties usually exclude household appliances, small cracks in brick, tile, cement or drywall, and parts covered by a manufacturer's warranty.[5] Get the warranty booklet before you sign. The FTC advises putting repair requests in writing.[5]
The Texas new-home contract does not create a builder warranty. TREC's New Home Contract (Incomplete Construction) says that except as set out in the contract, a separate writing, or as provided by law, "Seller makes no other express warranties."[2] The seller "shall assign to Buyer at closing all assignable manufacturer warranties."[2]
If you use an FHA-insured loan, know that FHA dropped its old 10-year protection plan requirement for new construction in 2019. HUD's Mortgagee Letter 2019-05 says the builder and buyer still sign the Warranty of Completion of Construction (form HUD-92544) and that "the buyer will still retain a one-year warranty."[4]
Texas law: no state builder agency, but a defect-claim process
Texas once had a state agency for residential builders. The Texas Sunset Advisory Commission reports that the Texas Residential Construction Commission "was abolished and the Act expired on September 1, 2009."[3]
What remains is the Residential Construction Liability Act, Texas Property Code Chapter 27. It sets steps to follow before suing a builder over a construction defect:
- Notice (Sec. 27.004(a)). You must send written notice by certified mail, return receipt requested, at least 60 days before filing suit or starting arbitration. It must describe the defects "in reasonable detail."[6]
- Inspection (Sec. 27.004(a)). During the 35 days after the builder receives notice, the builder may ask to inspect the home. Up to three inspections are allowed.[6]
- Settlement offer (Sec. 27.004(b)). The builder may make a written offer to repair or pay no later than the 60th day after receiving notice.[6]
- Rejecting an offer (Sec. 27.004(e)). If you reject a reasonable offer, your recovery can be limited to the value of that offer plus costs and fees incurred before the rejection.[6]
Sec. 27.007 requires most contracts covered by the chapter to include a boldface notice that the contract is subject to Chapter 27.[6] TREC's new-home contract includes that notice. Sec. 27.001 and 27.003 set the definitions and limits on liability.
The contract: TREC Forms 23 and 24
Texas real estate license holders are generally required to use contract forms promulgated by the Texas Real Estate Commission (TREC).[1] Two apply to new homes:
- TREC No. 23, New Home Contract (Incomplete Construction), for a home not yet finished.
- TREC No. 24, New Home Contract (Completed Construction), for a home that is finished.
In Form 23, a few paragraphs matter most when comparing builders:
- Construction Documents (7B). Plans, specifications, finish-out schedules, change orders and allowances, signed by both parties and made part of the contract. Your features list belongs here, not just in a brochure.
- Allowances and change orders (7C). Change orders must be in writing. If your selections go over an allowance, you pay the difference.[2]
- Completion (7E). The form has blanks for when construction must start and ties substantial completion to final approval by government authorities and any lender.[2]
If a builder uses its own purchase agreement instead, check it for the same points and have it reviewed.
Independent inspections during construction
Form 23 says the seller "shall permit Buyer and Buyer's agents access to the Property at reasonable times," and that you may use inspectors you choose who are licensed by TREC or otherwise allowed by law.[2] A code inspection is not the same as one you hire.
Buyers commonly schedule independent inspections at three points:
- Pre-pour, before the foundation concrete is placed.
- Pre-drywall, while framing, plumbing, wiring and ducts are still visible.
- Final, before closing, to build a punch list.
The contract does not set stage-by-stage timing, so ask each builder in writing how it schedules inspector access and whether it gives notice before each stage.
Builder-affiliated lenders and incentives
Some builders have an affiliated mortgage lender or title company and offer incentives, such as help with closing costs, for using it. Under the Real Estate Settlement Procedures Act (RESPA), these affiliated business arrangements are allowed if rules are followed. The CFPB's Regulation X, at 12 CFR 1024.15, requires a written disclosure of the relationship and an estimate of the affiliate's charges.[7] With limited exceptions, you cannot be required to use the affiliate.[7]
An incentive can still be worth taking, but compare the full loan offer. Get a Loan Estimate from the builder's lender and at least one other lender, and compare rate, points and fees. Get the incentive terms in writing.
Reading "standard features" versus options
Model homes often show upgrades. The standard features list shows what the base price includes. To compare fairly:
- Get the dated standard features list for the specific community and plan.
- Look for brands and ratings, not adjectives.
- Find the allowances (flooring, lighting, appliances) and their dollar amounts.
- Ask which energy certifications or ratings the home will have, and get the documentation.
- Confirm that the features list is part of the Construction Documents you sign.
Comparison checklist
Use the same list for each builder:
- Written warranty booklet received (date and version)
- Coverage periods for workmanship, systems and structure, as written
- Who backs the warranty: builder or a named third-party company
- Key exclusions and claim deadlines
- Contract form used (TREC No. 23, No. 24, or the builder's own)
- Standard features list for this plan and community, dated
- Allowance amounts listed
- Change-order process, and start and completion terms
- Inspector access policy for pre-pour, pre-drywall and final
- Affiliated business disclosure and written incentive terms
- Loan Estimates from at least two lenders
- Energy certifications claimed, with documentation