When builders report quarterly results, they include a number buyers rarely see: the cancellation rate, the share of signed contracts that never close. In 2026 that number jumped at some of the largest builders.

How common cancellations are right now

  • LGI Homes, based in The Woodlands, reported a cancellation rate of 48.9% for the first nine months of 2026, up from 28.1% a year earlier.[3]
  • D.R. Horton reported 23% in its quarter ended Sept. 30, 2026, up from 20%.[2]
  • Toll Brothers, which sells luxury homes, reported cancellations of 5.4% of contracts signed in its quarter ended July 31, 2026.[1]

All three are company-wide figures, not Houston numbers. The gap between them is telling: builders that sell to first-time and payment-sensitive buyers see far more deals fall through than a luxury builder does.

Why deals fall apart

Financing is the big one. LGI Homes said its outlook reflects "slower sales activity in the quarter as affordability pressures continued to weigh on demand," and that it has "broadened our sales process to work with more prospective customers who may need additional time to qualify."[3] When more buyers are close to the limit of what they can borrow, more of them fall short by closing day.

Things change between signing and closing. A to-be-built home can take months. CFPB notes that even a locked interest rate can change if there are changes "including your loan amount, credit score, or verified income."[5] CFPB's examples of what can move a locked rate include:[5]

  • the appraisal coming in higher or lower than expected
  • a credit score change after you take out a new loan or miss a payment
  • a lender that can't document overtime, bonus or other income

Rate-lock timing. Standard locks are "typically available for 30, 45, or 60 days, and sometimes longer," and extensions can be expensive.[5] If your lock expires before the home is finished and rates have risen, the payment you qualified for may no longer work.

The appraisal can change the math

New homes are appraised like any other home before the lender funds the loan. If the appraisal comes in lower than the contract price, the lender will base the loan on the lower value, and you may need to bring more cash, renegotiate or walk away under your contract's terms. CFPB lists an appraisal that "came in higher or lower than expected" among the reasons a locked rate can change.[5] In a market where builders are cutting prices and leaning on incentives, ask how recent sales in the community compare with your contract price.

Protect your deposit before you sign

  1. Get fully approved, not just prequalified. Ask the lender to review your income and asset documents up front.
  2. Get more than one Loan Estimate. CFPB recommends requesting "multiple Loan Estimates from different lenders."[4] You'll know your options if one lender's approval falls through.
  3. Read the financing and termination terms. Find out whether your contract lets you cancel if financing fails, by what date, and what notice you must give. Ask what happens to your earnest money and any option or upgrade deposits in each case. Design-center deposits are often handled differently from earnest money.
  4. Ask how long the rate lock lasts, and what an extension costs, before construction starts.

Protect the approval until closing

  • Don't open new credit cards or loans, including furniture or car financing.
  • Don't change jobs or move to commission or self-employed pay without talking to your lender first.
  • Pay every bill on time.
  • Keep the cash you need for closing where the lender can document it, and don't move large sums between accounts without telling your lender.
  • Answer the lender's document requests quickly, especially near the end of the build.
  • Check in with your loan officer every few weeks during a long build, so surprises surface early.

Questions to ask before you sign

  • How much earnest money do you require, and who holds it?
  • If my loan is denied, can I cancel, by what date, and do I get my earnest money back?
  • Are option or design-center deposits refundable if the sale doesn't close?
  • Do I have to use your lender to keep the incentive? If I switch lenders mid-build, what changes?
  • How long will my rate be locked, and who pays for an extension if construction runs late?

If something goes wrong

Tell your lender and the builder right away and in writing. Some problems can be fixed with a different loan program, a larger down payment or a later closing date, if you raise them early. If you think you may need to cancel, read the contract's deadlines before you act, and consider asking a real estate attorney.

For help sizing a payment you can comfortably carry, try our ownership cost calculator.